Abstract

The research content in the article is the next development step of the previous research. This article presents a new approach to calculate firm power distribution as the basis for building the operation diagram and selecting the suitable operation method for hydropower stations to improve power generation capacity and at the same time respond the requirements of the power system. The methodology is applied to the Tuyen Quang hydropower station. The obtained results from the application show the effectiveness of the methodology compared with the actual operation.