Common technical risks contracctors face when constructing mushroom slab systems, their causes and preventive measures

Các tác giả

  • Cu Huy Tinh

DOI:

https://doi.org/10.54772/jomc.v16i01.1308

Tóm tắt

Contractors executing mushroom slab structural works often encounter various risks that affect construction progress, quality and cost. This paper analyzes the causes of these risks and proposes several preventive measures for contractors.

Lượt tải

Chưa có dữ liệu tải xuống.

Tài liệu tham khảo

Dinh Tuan Hai, Nguyen Huu Hue, Risk Management in Construction, Construction Publishing House, 2016

Le Anh Dung, Bui Manh Hung, Risk Management in Construction Enterprises, Construction Publishing House, 2015

Bui Manh Hung, Formwork and Scaffolding in Construction, Construction Publishing House, 2013

Do Dinh Duc, Le Kieu, Construction Techniques – Volume 1, Construction Publishing House, 2004

Vietnamese Standard TCVN 4453:1995 – Cast-in-place Concrete and Reinforced Concrete Structures – Code for Construction and Acceptance

Cu Huy Tinh, Common Technical Risks for Contractors Using VRO Slabs and Preventive Measures, Journal of Construction Materials, Vol. 15 No. 2, April 2025

CCI Construction Joint Stock Company, Construction Method Statement for Mushroom Slab – Ngoc Xanh Project, 2025