Một vài kết quả ban đầu đánh giá về tác động và hiệu quả của cụm công trình Tắc Thủ đối với bán đảo Cà Mau

  • Doãn Văn Huế
  • Lê Thị Vân Linh
  • Nguyễn Trọng Tuấn
  • Tô Duy Hoàn
  • Tiến Thị Xuân Ái

Abstract

The construction of Tac Thu cluster of works and An Bien - An Minh hydraulic coastal works system accompanying the Cai Lon – Cai Be irrigation works system phase 1 and Quan Lo – Phung Hiep system will establish a closed area which begins from the southern boundary of Cai Lon river along with West coast to the Doc river to the Tac Thu area to the Ca Mau – Bac Lieu channel and connects with the Quan Lo – Phung Hiep area. Closing this area by an irrigation works system will help control saltwater intrusion, proactively produce for shrimp-rice models, control the high level tides, and alleviate flooding in the southern area of Cai Lon river. The Tac Thu cluster of works alone covers an area of 176.968 ha in Kien Giang, Ca Mau and Bac Lieu provinces

điểm /   đánh giá
Published
2023-06-27
Section
Bài viết