Research and development of a programmable assumed load unit for testing insulation resistance of mine networks with isolated neutral
Keywords:
Programmable assumed load unit; insulation resistance testing; network with isolated neutral
Abstract
Protective devices used in isolated 3-phase neutral low-voltage networks used in the mining industry are required to be tested and inspected before being put into operation. For testing, an assumed load combination with variable configuration is required to simulate different operating conditions. Currently, inspection as well as production facilities are commonly using loads that use manual switching, which are relatively cumbersome and complicated during the connection process.
The article presents the results of research, design and development of a programmable assumed load unit for testing the insulation resistance of mine network with isolated neutral.
điểm /
đánh giá
Published
2024-10-06
Section
MECHANICAL ENGINEERING, ELECTRICITY- ELECTRONICS - AUTOMATION